Cedar Grove Connector

LinkWater Projects is commencing a study into the feasibility of a bulk water pipeline—the Cedar Grove Connector—from the proposed Wyaralong Water Treatment Plant into the SEQ Water Grid network.

The proposed pipeline will help to ensure a more reliable and manageable water supply to the Logan, Scenic Rim and Brisbane areas.

The feasibility study will determine a potential pipeline route running north of the Wyaralong Water Treatment Plant and its offtakes and connection points.

Click here for the project fact sheet.

Related Links



NB. Click image to enlarge 

LW Assets Map thumb


DBYD-LOGO.gif