LinkWater Projects is commencing a study into the feasibility of a bulk water pipeline—the Cedar Grove Connector—from the proposed Wyaralong Water Treatment Plant into the SEQ Water Grid network. The proposed pipeline will help to ensure a more reliable and manageable water supply to the Logan, Scenic Rim and Brisbane areas. The feasibility study will determine a potential pipeline route running north of the Wyaralong Water Treatment Plant and its offtakes and connection points. Click here for the project fact sheet. |




